Recent Posts
Recent Comments
Archives
- April 2020
- February 2017
- November 2016
- January 2016
- March 2015
- September 2014
- August 2014
- July 2014
- March 2014
- February 2014
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- June 2013
- May 2013
- April 2013
- March 2013
- December 2012
- November 2012
- October 2012
- June 2012
- January 2012
- October 2011
- April 2011
- March 2011
- February 2011
- January 2011
- December 2010
- November 2010
- October 2010
- September 2010
- August 2010
Categories
Meta
Author Archives: Kevin Wilcox
We passed inspection! Commissioning is set for 9/13.
The inspector and my contractor showed up yesterday and the setup breezed through inspection. Having a parallel PV installation was key here since it split out the existing residential/expense side of my electrical installation from the new commercial/revenue side. As … Continue reading
Completed installation; we are ready for inspection!
My contractor has finished the array connections and a nicely done piece of work it is too! Here’s a few shots of the roof mounted junction box: The box itself contains a DIN rail that can be used for surge … Continue reading
Installing panels and inverters.
With the panels finally on site, it was time to get down to their actual installation. First, I needed to mock up the inverter/panel position to derive a measurement template. As it turned out, the inverters could be mounted directly below … Continue reading
Installing the second Renusol rail.
The weather was nice and cool last Sunday; perfect for working above the garage, so I installed the second Renusol rail. This one would be a bit trickier than the first because the rail itself landed between two rafters. To … Continue reading
Things keep rolling along… dual meter base installation!
The project reached several important milestones last week! First was the double meter base installation that was completed on the 22nd. Everything got underway at about 8:30AM when I started up the genset to power the house electronics/server systems for … Continue reading
The wait is over! Construction progress…
A lot happened this week! The Pieper residental group electrician stopped by with a dual meter base on Thursday but it was the wrong size. Our meter comes in right next to a window so a single hub dual meter … Continue reading
Solar project update
We got plan approval and the go-ahead to build from WE energies last week! I also filed my grant paperwork from this site after calling the listed number and being told that grant funds were still available. The weather was pretty … Continue reading
SunEye report and more prep work.
Our contractor arrived last week with his SunEye and did a full shading workup of the roof. Essentially he measured 6 points on the roof as shown here: The important measurements for this year are locations 1 and 2 since this … Continue reading
The Bottom Line on the initial install.
The estimate is in and its $2350 for the initial hookup minus the price of the four solar panels themselves. For this price, my contractor will provide the following: Renusol Racking and components for (4) modules (material only). (4) Enphase … Continue reading
Contractor discussions, DIY tasks and Derate Factors
Well, we met our Solar contractor today and yeah…. he’s a geek right down to the Nikola Tesla is his hero part. More importantly, we’re both on the same page concerning the installation. He has no problems letting me save … Continue reading